Info session TODAY on dismantlement of Hydro-Québec Line 2
11/20/2019
The Mohawk Council of Kahnawà:ke (MCK) wishes to remind Kahnawà:ke entrepreneurs that an information session is being held today to present information about requirements, prerequisites and mandatory certifications needed to prepare a bid regarding the dismantlement of Hydro-Québec’s Line 2, which passes through the Territory.
It is expected that the line will be dismantled within the next two (2) years.
The info session is being conducted by Hydro-Québec, in collaboration with Tewatohnhi’saktha and the Kahnawà:ke Labor Office.
The session is taking place at the Host Hotel from 9am until noon.
|