North Creek road sewer line replacement
09/13/2013
The Mohawk Council of Kahnawà:ke would like to inform all Kahnawa’kehró:non of the upcoming project to replace the sewer line in the North Creek Road area, located across from the Old Malone Pharmacy. The work is scheduled to start on Monday, September 16th, 2013 and will continue until mid-November 2013.
This project will include replacing the sanitary sewer system. Upon completion, the road will be resurfaced with new asphalt. Residents in the area may be inconvenienced with temporary loss of water, dust and noise from trucks and equipment, detours, and temporary road closures. Residents will be notified at least one day prior to having the water turned off.
Proper road signalization will be installed to warn of the construction limits. The community will also be notified when a road closure is scheduled.
All private properties that are affected by the work in this area (e.g. driveways, walkways, hedges and/or fences) will be repaired or replaced prior to the completion of the project.
Your patience throughout this project is greatly appreciated. Please contact the Technical Services Office at 635-1016 if further information or special needs are required.
|